Skanska Headquarters EV Charging
Sector | Sustainability |
Contract Period | 12 Weeks |
M&E Value | £200k |
• Detailed design of new electrical services to suit the installation of 100 Electric Vehicle Charging points.
• Design of multiple speed EV charging systems from 50kW to 7kW
• Ensuring the existing car parking was not impeded by the installation of new switchgear to feed the chargers
Metal Box Reception and Atrium
Sector | Commercial |
Contract Period | Phased across two phases for a duration of 25 weeks |
M&E Value | £400K |
Architect | Brinkworth |
Quantity Surveyor | Winter Associates |
• Detailed Design from RIBA stage 1 to completion
• Building the client brief for the MEPH services
• Ensuring full coordination of the services, with the interior designer and other specialist trades
Iceland, Dunstable
Sector | Retail |
• Carry out surveys to establish the current HVAC system type, conditions and life expectancy
• Carry out a design to replace existing HVAC for retail area and install split system AC unit to achieve COP, EER and SEER minimum of 4.0
• Review of tender return documents
Ashley Centre
Sector | Retail |
Architect | Leslie Jones Architecture |
• Review of all MEPH validations, to confirm the building capacity against the proposed requirements.
• Complete a phased installation plan to enable works to be complete while the centre remained open to the public.
• Carry out full Mechanical and Electrical infrastructure calculations and design to the entirety of the premises, inclusive of:
- New sub main cabling
- New switchboards
- New distribution boards
• Design of new general and emergency lighting throughout the common areas, inclusive of the external entrances.
• Design and calculations of all new Christmas decoration power supplies throughout the common areas.
Amazon Fresh
Sector | Retail |
Architect | LOM |
• RIBA Stage 1 through to Stage 5
• Design development and coordination with the architect, Amazon and M&E sub contractors to ensure all requirements are met.
• Design of all MEP services
Nimbu Restaurant
Sector | Hospitality |
• Complete survey of the existing MEPH services throughout
• Design proposal with the specialist catering consultants to ensure all necessary MEPH services were coordinated and designed as required for the fit out.
• Feeding into the cost consultant throughout the design process to ensure cost certainty
• Design development and coordination with the architect to ensure:
- Planning permission
- Acoustics
Bakery Brasserie & Urban Market
Sector | Hospitality |
• Complete survey of the existing MEPH services throughout
• Ongoing workshops and design team meetings with the architect and catering consultant team
• Detailed design for the following:
- LED lighting
- Energy metering
- New riser routes for new MEPH plant
- All electrical services for catering equipment
- Waste services design
- CWS and HWS design
- Detailed review and design of the existing electrical building capacity Vs the new proposal
Project Story
Sector | Hospitality |
• New installation of a complete restaurant across two floors – ground floor and basement.
• Survey of the existing electrical, mechanical and Public Health systems within the buildings
• Design of interfacing the new catering systems for the bar at ground floor and the kitchen within the basement
• Detailed design for all MEPH services
• Thorough design around the basement waste services and extract systems
• Completion of the new EPC certificate at the end of the project
MK Microbrewery & Bar
Sector | Hospitality |
• Complete survey of the existing MEPH services throughout the proposed demise
• Complete coordination with Toast (the distillery consultant)
• Workshops and design team meetings throughout the entirety of the design
• Detailed calculations and design for the following:
- Distillery cooling
- Distillery and bar lighting
- Small power design to suit the proposed bar and distillery requirements
- Associated containment for pipework and cable design throughout the demise
- Calculations and design of the new bar infrastructure
Unity Place - Santander
Sector | Commercial Fit out |
Contract Period | 60 weeks |
M&E Value | £20m |
Architect | LOM |
Quantity Surveyor | Turner and Townsend |
• Appointed as the contractor design team for this D&B project, taking the design from RIBA stage 3 to stage 5
• New multistorey development with new MEPH services throughout
• CAT A and B fit out to 7 levels of office
• Multiple catering facilities
O2 Intercontinental Hotel - Ballroom
Sector | Hospitality |
Contract Period | 52 weeks |
Architect | UNUM Partnership |
• Appointed as the contractor design team for this D&B project, taking the design from RIBA stage 3 to stage 5
• Conversion of the existing car park facility into a new double height hospitality conference suite development with new MEPH services throughout
• Inclusion of new full cook kitchen facilities for 1140 covers
Grosvenor Court
Sector | Residential |
Contract Period | 10 weeks |
• Redevelopment of the existing property.
• Energy monitoring and data review over numerous weeks to ensure the building infrastructure was adequate.
• Feasibility and re design of the main heating system.
1-3 Grosvenor Square
Sector | Residential |
• Redevelopment of the property to include for 44 residential units, gym and car park.
• Survey of all MEPH services to four units, one of which being a duplex apartment for a potential purchaser.
Claritas Toms Lane
Sector | Residential Development |
Architect | Kyle Smart Associates |
• Development of 4 new residential properties
• Development of Thermal model
• Full liaison and design with the utility companies for all main utility requirements
• Production of EPCs for the four properties
• MEPH post contract consultancy services, supporting the client and contract team throughout the duration of the build
DAMAC Tower
Sector | Residential |
M&E Value | NDA |
Architect | Client direct (confidential) |
Quantity Surveyor | Ellmers |
• Conversion of 7 existing apartments into a single high end residential property
• Complete strip out of all services within the building
• Design of new MEPH services throughout to suit the client's high-end requirements
• Luxury finishes and detail
Wilton Crescent
Sector | Residential |
M&E Value | NDA |
Architect | KTA |
Quantity Surveyor | 2110 Consult |
• Complete strip out of all services within the building
• Refurbishment of the main house and mews
• Luxury finishes and detail
Milton Keynes
Sector | Commercial Fit Out |
M&E Value | £5million |
Architect | LOM architects |
Quantity Surveyor | Turner and Townsend |
• Detailed design of new mechanical, electrical and public health services
• Working to an expedited programme to ensure the client requirements of early to mid-April 2023 are achieved.
• Working closely with the interior designers, 3D team and other trades to ensure full detailed coordination throughout
Lloyds Tower
Sector | Commercial Fit out |
Contract Period | 20 weeks |
M&E Value | £2.4m |
Quantity Surveyor | T&T |
• Mechanical and Electrical refurbishment of galleries 5, 6 and 12
• The Grade 1 listed building required careful thought and design to ensure existing features were maintained and were not compromised though the refurbishment
Metal Box Units
Sector | Commercial Fit out |
Contract Period | 16 weeks |
M&E Value | £210k |
Quantity Surveyor | Naismiths |
• Mechanical, Electrical and Public Health refurbishment of units 129-134
• The CAT A+ MEPH fit out was carried out within a live building, connecting to the existing building infrastructure while ensuring minimal disruption to the existing tenants and landlord services
Procession House
Sector | Commercial incl. Shell & Core |
Contract Period | 40 Weeks |
M&E Value | £6.9m |
Architect | JRA |
Quantity Surveyor | Stace |
• Complete strip out of all services within the building
• MEPH design from Stage 3 to Stage 6 of 106,000 sqft office area
• CAT A fit out of ground floor reception, level 1 and 2