About us
We build strong relationships amongst other things
At the heart of our business is our people, we believe in building relationships that last. Supporting our clients and employees needs and ambitions.
Services
We have extensive experience within our team of experts covering all aspects of planning, design and implementation of a project.
Projects
Shaping our business to you.
Skanska Headquarters EV Charging
Sector | Sustainability |
Contract Period | 12 Weeks |
M&E Value | £200k |
• Detailed design of new electrical services to suit the installation of 100 Electric Vehicle Charging points.
• Design of multiple speed EV charging systems from 50kW to 7kW
• Ensuring the existing car parking was not impeded by the installation of new switchgear to feed the chargers
Metal Box Reception and Atrium
Sector | Commercial |
Contract Period | Phased across two phases for a duration of 25 weeks |
M&E Value | £400K |
Architect | Brinkworth |
Quantity Surveyor | Winter Associates |
• Detailed Design from RIBA stage 1 to completion
• Building the client brief for the MEPH services
• Ensuring full coordination of the services, with the interior designer and other specialist trades
Milton Keynes
Sector | Commercial Fit Out |
M&E Value | £5million |
Architect | LOM architects |
Quantity Surveyor | Turner and Townsend |
• Detailed design of new mechanical, electrical and public health services
• Working to an expedited programme to ensure the client requirements of early to mid-April 2023 are achieved.
• Working closely with the interior designers, 3D team and other trades to ensure full detailed coordination throughout
Procession House
Sector | Commercial incl. Shell & Core |
Contract Period | 40 Weeks |
M&E Value | £6.9m |
Architect | JRA |
Quantity Surveyor | Stace |
• Complete strip out of all services within the building
• MEPH design from Stage 3 to Stage 6 of 106,000 sqft office area
• CAT A fit out of ground floor reception, level 1 and 2
Lloyds Tower
Sector | Commercial Fit out |
Contract Period | 20 weeks |
M&E Value | £2.4m |
Quantity Surveyor | T&T |
• Mechanical and Electrical refurbishment of galleries 5, 6 and 12
• The Grade 1 listed building required careful thought and design to ensure existing features were maintained and were not compromised though the refurbishment
Metal Box Units
Sector | Commercial Fit out |
Contract Period | 16 weeks |
M&E Value | £210k |
Quantity Surveyor | Naismiths |
• Mechanical, Electrical and Public Health refurbishment of units 129-134
• The CAT A+ MEPH fit out was carried out within a live building, connecting to the existing building infrastructure while ensuring minimal disruption to the existing tenants and landlord services